Field & Foundry · Woodstock, GA
Replace an unused or worn-out tub with a safe, easy-to-clean shower. Field & Foundry handles the plumbing, waterproofing, tile and glass for Woodstock homes, with one written estimate and clear options.
Who a tub-to-shower conversion is for
Most Woodstock homeowners who ask about replacing a tub with a shower fall into three groups. Some have a hall or guest bath where the tub never gets used and the space would serve the household better as a roomy shower. Others are planning to stay in their home for years and want to remove a high tub wall before it becomes a daily hazard. The rest simply have an aging tub and surround with cracked caulk, stained grout or soft wall board behind it, and they would rather rebuild the whole wet zone than patch it again.
A conversion also suits homes that already have a second tub elsewhere. If a bathroom is the only one in the house with a tub, we will talk through resale and family needs before you commit, because some buyers and some households with small children still expect one. Our walk-in shower vs. tub guide walks through that decision in more detail.
Three ways to convert a tub to a shower
The right method depends on your budget, your tolerance for demolition and how you want the finished shower to look. These are the three approaches we price most often in Woodstock bathrooms.
| Approach | What it involves | Typical on-site time | Best for |
|---|---|---|---|
| Prefabricated base and wall surround | Tub removed, new low-profile base set on the existing drain, one-piece or multi-piece acrylic or solid-surface walls | 2–4 days | Budget-conscious updates, hall and guest baths |
| Custom tiled shower in the tub footprint | New waterproofing system, mortar or foam pan, tile walls and floor, niche, bench or glass door | 7–12 days | Homeowners who want a finished, higher-end look |
| Curbless walk-in shower | Subfloor lowered or recessed, linear or center drain, continuous floor tile, frameless glass | 10–18 days | Aging in place, mobility needs, spa-style primary baths |
On-site time is a planning range for the shower work alone. Design, product ordering and permits come before the first day of demolition.
What a tub-to-shower conversion costs
No honest number applies to every bathroom, so we give ranges and then replace them with a written estimate after seeing your space. The chart below shows typical planning ranges for the three approaches. They reflect what is commonly published for the United States, not a quote, and Georgia pricing moves with labor, tile and glass choices.
Typical planning range by approach (United States, before your written estimate)
$3,000 – $7,000
$6,000 – $14,000
$10,000 – $22,000
Planning ranges only. Your Field & Foundry estimate lists every line item so you can compare it with other bids.
For a wider look at budgets, see our remodeling cost guide and the bathroom remodeling page, which show how a shower conversion fits inside a larger bathroom project.

What moves the price up or down
Drain and plumbing location
A tub drain sits in a different place than a shower drain. If the drain is in the right spot, the work stays simple. If it has to move, we open the floor, which adds labor and sometimes framing changes. Older homes can also hide galvanized or mixed-material supply lines that are wiser to replace while the wall is open.
Walls, waterproofing and floor system
The waterproofing behind tile is the part you never see and the part that decides whether the shower lasts. Quality systems use a continuous membrane or sealed backer board with treated seams, plus a properly sloped pan. Cutting corners here is how leaks start, so we price it as a core line item, not an upgrade.
Glass, valve and fixtures
A framed sliding door, a semi-frameless door and a fully frameless panel can differ by several hundred to a few thousand dollars. Valves and trim also range widely. A thermostatic or pressure-balanced valve is worth discussing with the plumber, especially in a household with children or older adults.
What we find when the tub comes out
Rot behind an old surround, outdated drain lines or an uneven subfloor are common discoveries. We explain them with photos and a written change order before extra work begins, so the price never moves without your approval.
Ready to price your shower conversion?
Tell us about your bathroom and we will arrange a visit, measure the space and give you a written estimate with clear options.
Safety and comfort details worth planning now
A shower can be safer than a tub, but only if it is designed that way. We usually recommend a low threshold or curbless entry, slip-resistant floor tile with smaller grout-lined mosaics, a built-in bench or fold-down seat, blocking inside the walls for future grab bars, and a handheld shower head on a slide bar. Better lighting and a moisture-rated exhaust fan matter too, because they keep the new surfaces dry and the air healthy.
If you are planning for long-term living at home, our aging-in-place remodeling page covers doorway widths, flooring transitions and other upgrades that pair well with a new shower.
How a conversion runs from first call to final walkthrough
| Phase | What happens | Your decisions |
|---|---|---|
| 1. Visit and measure | We inspect the bath, check the drain and walls and discuss how you use the space | Prefab, tiled or curbless; glass style |
| 2. Written estimate | Scope, materials allowances and timeline in writing | Approve scope and finishes |
| 3. Selections and ordering | Tile, valve, trim, door and base are chosen and ordered | Tile, color, fixtures |
| 4. Demolition and plumbing | Tub removed, walls opened, drain and supply lines set or corrected | Approve any hidden-condition changes |
| 5. Waterproofing and build | Pan, membrane and walls built and flood-tested where applicable | None, we handle inspections |
| 6. Finish and walkthrough | Tile, grout, glass, fixtures and cleanup, then a final review with you | Punch-list items |
Permits and local notes for Woodstock
Replacing a tub with a shower usually involves plumbing work, and moving a drain or altering framing can trigger permit and inspection requirements. Rules vary by jurisdiction and project, so we confirm what applies with the City of Woodstock or Cherokee County before work begins and handle the paperwork when it is required. Homes in neighborhoods with an HOA may also need approval for exterior-visible changes, though an interior bathroom conversion rarely does.
Materials and finishes that hold up in a Woodstock shower
Georgia summers are humid, and a bathroom that stays damp grows mildew quickly, so material choices matter as much as layout. Porcelain tile is dense and nearly waterproof, which makes it a dependable choice for shower walls and floors. Large-format tile means fewer grout lines to clean, while a small mosaic on the floor gives better traction where it counts. Natural stone looks beautiful but needs regular sealing, so we only recommend it for homeowners who are comfortable with that upkeep.
- Grout: epoxy or high-performance cement grout resists staining better than basic sanded grout.
- Niches and benches: built-in storage keeps bottles off the floor and out of the way of the glass.
- Ventilation: a quiet, properly sized exhaust fan vented outside protects the finish for years.
- Lighting: a moisture-rated fixture above the shower makes the space feel larger and safer.
We bring samples to your home so you can see them in your own light, then confirm quantities, lead times and allowances in writing before ordering.
Woodstock by the numbers
Median owner-occupied home value in Woodstock is about $436,500, 31% above the U.S. median of $332,700. About 64% of homes are owner-occupied, so Woodstock mixes long-term owners with a meaningful rental share. Values in Woodstock sit in a range where a mid-scope project can add real value without over-building for the street. That is the context we bring to tub-to-shower conversions in Woodstock.
Source: U.S. Census Bureau QuickFacts. Population from the 2020 Census; housing and income from 2020–2024 estimates.
Frequently asked questions
How long does a tub-to-shower conversion take?
A prefabricated conversion often takes two to four days on site. A custom tiled shower usually takes one to two weeks, and a curbless design can run longer. Ordering time for tile and glass comes before that.
Can I keep my existing drain?
Often yes, especially for prefabricated bases and tiled showers built in the tub footprint. If the drain is off-center or at the wrong height, we explain the options before work starts.
Will converting hurt my home’s resale value?
It depends on the house. Homes with at least one other tub are usually fine. If this is your only tub, think about your buyer pool and your family stage before removing it.
Is a walk-in shower safer than a tub?
It can be, because there is no tall wall to step over. Safety still depends on slip-resistant flooring, good lighting, a bench and solid blocking for grab bars.
Do you handle the plumbing and tile?
Yes. We manage the plumbing, waterproofing, tile and glass as one project with one point of contact.
What is included in the estimate?
Demolition, plumbing changes, waterproofing, tile or panels, glass, fixtures, cleanup and any permit fees that apply, with allowances clearly labeled so you can compare bids.
Request an estimate
Share a few details about your project and Field & Foundry will follow up. Prefer to talk? Call (470) 847-9076.
